Emergency exit doors are not chosen from a catalogue. Their requirements are set by the project consultant and the competent authority, and the owner checks them before approval. Your job as owner, contractor or facility manager is to ask the right questions early, so suppliers receive clear requirements instead of guesses.

This guide does not explain any specific regulation, and it does not replace your consultant. It is a working list of questions that get decisions on paper, the documents you will need, and how to plan inspections once the building is in use.
Why start with the consultant, not the supplier?
A door on an escape route is part of the building’s life safety strategy, not just an entrance. Door type, swing direction, how it opens in an emergency, and how it interacts with the fire alarm and access control are design decisions made by the consultant and possibly reviewed by the authority. Approach suppliers before those decisions and you may receive quotes that do not match what is eventually required.
What should you ask before approval?
Ask the consultant for written answers to these questions for each door on an escape route:
- Which doors: which doors are on escape routes, and which are dedicated emergency exits?
- Swing and operation: which direction must it open, and is direct manual opening from the escape side required?
- Automatic doors on the route: is an automatic door acceptable here, and how must it behave in an emergency?
- Power failure: what must the door do when power is lost?
- Fire alarm signal: is the door linked to the alarm, and what action is required on a signal?
- Access control: if the door is locked for security, how is it released in an emergency, and who approves the method?
- Hardware: what is required for locks, panic hardware, self-closing and associated signage?
- Approval route: does the door or its documentation need authority review, and who submits it?
What should suppliers provide for review?
Once requirements are clear, the consultant needs supplier data to judge each proposal. Ask every supplier for:
- Technical data for the proposed door and hardware.
- A description of behaviour on power loss and on an alarm signal.
- How it interfaces with fire alarm and access control, and where each party’s responsibility ends.
- Any submittals the consultant lists for material approval.
Do not accept a general line in a quote saying the door “meets requirements”. Compliance is judged by the consultant and the authority on the documents, not by the supplier’s description.
How do you handle security versus egress?
This is where most project disputes start. Security wants doors locked; egress requires doors that open easily when needed. The answer comes from a design decision that brings together the consultant, the security lead and the access control supplier, defining how the door stays secure day to day and how it releases in an emergency. For ways doors are tied into access systems, see access control solutions for buildings.
A suggested sequence
-
Identify the doors
Mark the doors on escape routes on the drawings with the consultant.
-
Get written requirements
Record answers to the questions above for each door or group of similar doors.
-
Issue one request
Send the same requirements, drawings and sizes to every supplier.
-
Review submittals
Put technical data in front of the consultant before any quote is approved.
-
Test at handover
Test the agreed behaviours with the owner present, and record the results.
Which documents should you keep after handover?
Keep a file for every emergency door with facility management, because it will be asked for at any later review or modification. It should hold the consultant’s approved requirements, the approved technical data, the test and handover record, operating instructions, the warranty document, and the maintenance and inspection log. If a door or its hardware is modified, record the change and review it with the consultant.
How should periodic inspection be planned?
An emergency door that is rarely used can fail without anyone noticing. It needs planned inspections, with frequency and scope based on the consultant’s or authority’s direction, the system’s operating instructions and the site.
- What is checked: opening and closing, hardware, and behaviour on power loss and on alarm signal where linked.
- Who checks: what the facility team can observe routinely, and what needs a qualified technician.
- Coordination: alarm interface tests need the site’s fire system lead involved.
- Records: a dated log of each inspection, findings and actions.
- Obstructions: confirm the route on both sides of the door is not blocked by storage or furniture.
Emergency doors can be included in a preventive maintenance contract with their own scope and a report after each visit.
Common mistakes
- Approving a door before the consultant decides: then re-supplying or modifying it.
- Locking an exit for security: without an approved release method.
- Linking to the alarm without testing: or without recording the test at handover.
- Skipping inspections: because the door is rarely used.
Where Vally World fits
Vally World supplies emergency exit doors, works to the project requirements with the consultant and contractor, and provides the technical data the consultant needs for review. You can request engineering consultation to discuss options before approval. We do not replace the consultant or the authority in setting or approving requirements. Handover includes a test and handover record, operating instructions and a warranty document.
Requirements for emergency exits and escape routes come from the Saudi Building Code and the General Directorate of Civil Defense; your project consultant confirms which apply to your facility.
Frequently asked questions
Who sets the requirements for emergency exit doors?
The consultant, as part of the life safety design, possibly subject to authority review. The owner checks them before approval, and the supplier works to the approved requirements.
Can an automatic door be used on an escape route?
That depends on the consultant’s and authority’s decision for that location, and on how the door must behave in an emergency and on power loss.
Is a supplier’s statement of compliance enough?
No. Compliance is judged by the consultant and the authority through review of technical documents, not by a line in a quote.
How often should emergency doors be inspected?
Frequency is set by the consultant’s or authority’s direction, the system instructions and the site. What matters is that inspections are scheduled and recorded.
Next step
If you have consultant-approved requirements, send them with drawings and sizes through the Request a Quote page, and we will prepare a quote based on them.