To compare automatic door quotations fairly, align the scope, specifications and exclusions first, and only then compare price. A lower quote is often lower because it leaves out work the owner or main contractor will pay for later, or because it offers a different system, not because it is better value.

Quotes rarely arrive in the same shape. One shows a single line per door, another breaks out the operator, sensors and controller, a third bundles maintenance or ignores it. This guide is for procurement teams, facility managers and contractors who need to turn those documents into one comparable picture.
Why can you not compare quotes as received?
Because each supplier fills the gaps in your request with its own assumptions: dimensions, operation mode, civil works, power supply. The totals then describe different jobs. A good comparison starts before the quotes arrive, with a clear request that gives the same information for every opening. Our checklist of information needed for an automatic door quotation covers the basics.
What should be aligned before comparing?
Build one sheet with a row per opening and check that every quote covers the following:
- Door type and opening method: the same type in every quote, or an alternative proposed?
- Dimensions used for pricing: surveyed on site or taken from approximate figures?
- Operating components: operator, controller, safety devices, sensors and activation.
- Integration: links to access control or fire alarm, and who handles each side.
- Supply, installation, commissioning and testing: all included, or some priced separately?
- Warranty, handover and maintenance: what is actually written down.
How should you read scope and exclusions?
Read the exclusions before the price. Most large gaps between quotes sit in what is not included: installation-related civil works (foundations, floor cutting, cable routes), power to the opening, and making good around the frame. These items can sit with the supplier or with the owner or main contractor. What matters is that the split is written down.
- Does the quote state who does installation-related civil works?
- Does it bring power to the controller, or assume a ready supply point?
- Are delivery to site and lifting into position included?
- Are there site-readiness conditions before work starts?
- What counts as a variation, and how is it priced?
Treat anything not mentioned as excluded until the supplier confirms otherwise in writing.
Are the specifications really the same?
Not necessarily, even when the doors share a name. Ask each supplier for technical data on every proposed system, then compare materials, finish, safety devices, manual operation during a power cut, and suitability for the expected duty. Specifications are defined per project, based on opening size, usage and site conditions, so a price gap can reflect a real difference in the system. If a supplier proposes a different door type, ask why, and test the proposal against the criteria in how to choose the right automatic door.
What does each warranty actually cover?
Compare terms, not headings. A line saying “warranty included” tells you little. Ask about the period, whether it covers supply, installation or both, what voids it, and how you call for service during it. Make sure the terms appear in the quote or in a warranty document issued at handover.
Which handover documents are listed?
Handover documents are part of what you are buying, because your operations and maintenance teams will rely on them. Check whether the quote lists a test and handover record, operating instructions, a warranty document and basic user training. Their absence will not show in the price, but it will show at the first fault.
Maintenance and spare parts after installation
The real cost of a door includes the years it runs. Ask each supplier about preventive maintenance contract options after the warranty, how faults are reported, and how spare parts will be identified and supplied later.
A comparison sheet you can use
| Item | What to look for | Question for the supplier |
|---|---|---|
| Scope | Supply, install, commission and test per opening | What is not included? |
| Civil works and power | A named party for each item | Who does foundations and power to the opening? |
| Specification | Technical data for each system | How does your proposal differ from the request? |
| Warranty | Written period and terms | What is covered and what is excluded? |
| Handover | Test record, operating guide, warranty document, training | Which documents will we receive? |
| After installation | Maintenance and parts options | How do we report a fault after handover? |
A practical sequence for comparing automatic door quotations
-
Standardise the request
Send every supplier the same information per opening, with photos and approximate dimensions.
-
Put all quotes on one sheet
One row per opening, one column per supplier, including scope and exclusions.
-
Close gaps in writing
Ask for clarification on anything vague or missing before you look at money.
-
Price the exclusions
Estimate what the owner or contractor will carry under each quote.
-
Compare totals, then value
Once aligned, weigh price against warranty, handover and after-sales support.
Common mistakes when comparing automatic door quotations
- Comparing the bottom line only: without reading exclusions, payment and programme terms.
- Accepting alternatives unchecked: without consultant or project engineer review.
- Overlooking site obligations: such as a ready opening and power before installation day.
- Relying on verbal promises: about warranty or maintenance that never reach the contract.
How Vally World structures a quotation
Vally World quotations set out the scope for each opening and what sits with the owner or contractor. Installation-related civil works and power to the opening can be in our scope or handled by the owner or main contractor, and the split is written into the quote. The warranty on supply and installation is stated with its period and terms for the system offered, and handover includes a test and handover record, operating instructions and a warranty document.
One item worth asking about in every offer is product conformity with the standards adopted by the Saudi Standards, Metrology and Quality Organization (SASO).
Frequently asked questions about automatic door quotations
Is the lowest quote the best value?
Not always. It may exclude civil or electrical work, or offer a different system. Add the cost of exclusions to each quote before deciding.
Do I need a site survey before comparing quotes?
A survey makes quotes more accurate because it fixes dimensions and site conditions. You can request a site survey before the final quote is approved, especially for irregular openings.
What if a supplier proposes a different door type?
Ask for the reasoning and the technical data, then review it with your consultant. The alternative may suit the site better, or it may simply be a way to bring the price down.
Should the quote include maintenance?
It does not have to be priced with the supply, but the supplier should explain post-handover maintenance options so you can compare cost over the operating life.
Next step
If you are preparing a request for several openings, send dimensions, photos and a description of use through the Request a Quote page. You will receive a quote that sets out scope and exclusions line by line.
